All case studies
Architecture / Process AutomationCompleted

Vertex Architecture

Practice spending hours manually editing specification documents for each project.

Video run-through coming soon

Outcome

Around 3 hours saved per job

The problem

Every project meant manually editing long specification documents, a slow and error-prone task that ate into billable design time.

What we built

We replaced the manual editing with a tick-box system that generates the general specification document automatically from the choices made for each job.

  • Automated general specification document generation
  • Tick-box system replaces manual document editing
Book a Call

Ready to get your time back?

30-minute discovery call, no strings attached.